Rolling out a fleet

When you need many seats that match, we build every system the same way. We test each one before it ships. Each one comes labeled and set up the same way, and it is in your fleet manager on the day it ships.

Talk to us about a rollout
A row of identical OP-S on a dark workbench.

How a rollout runs

  1. Before it ships

    On a fleet plan, a change to any part of your build comes with 90 days’ notice and our tests of the new part. So the build stays locked: systems you order later get the same parts, and every seat matches.

    Every system runs 24 hours with its GPUs and processor at full load before it ships, and its test log is tied to its serial. We put your asset tags on each one in the format you use, with the same BIOS and power settings.

  2. When it ships

    We can ship in batches, one group at a time, as each one is ready for its systems.

    Each system is in your fleet manager when it ships. Its build, serial, test log and warranty are there too.

    Sim group 24 systems · OP-S · RTX PRO 6000
    4 of 4 working
    Sim group 2 as it arrives: each system shipped, then delivered, then working
    SerialLabelState
    OPC-000044Sim bay 4Working
    OPC-000045Sim bay 5Working
    OPC-000046Sim bay 6Working
    OPC-000047Spare for Sim group 2Working
  3. At refresh

    Replace one room while the others keep running. Old and new systems sit in one fleet manager until the last room is done.

    When you replace the fleet, we take the old systems back. Their drives can stay with you. What happens to a drive

    Sim group 16 systems · OP-S · RTX PRO 6000
    3 of 3 returned
    Sim group 1 at refresh: each new system beside the one it replaces, which is marked for return, then returned
    SerialLabelState
    OPC-000041Sim bay 1Returned
    OPC-000301Sim bay 1NewWorking
    OPC-000042Sim bay 2Returned
    OPC-000302Sim bay 2NewWorking
    OPC-000043Sim bay 3Returned
    OPC-000303Sim bay 3NewWorking

What stays with you

We do not install your operating system or your software. Your team puts on its own image. Since every system matches, one image works on all of them.

Tell us how many seats you need and when each room is ready.